The dpLoc.y trace ranges from 34,138.8 to 158,586.5 across 101 saved checkpoints. It begins at 50,000 and finishes at 51,183.2 after 8,400 s of test time. The reference export does not state a verified engineering unit for this value. Use its native scale when comparing another run of the same model.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named ControlDifferentialPressure. The source file places it under Templates, Plants, Controls, Pumps, Generic. We used the 101 stored values for dpLoc.y over the interval 0 to 8,400 seconds. This is a simulated test with specified inputs and boundaries.
The largest change in dpLoc.y between saved samples lies between simulation times 7,140 s and 7,224 s. The channel moves from 34,138.8 to 56,470.6 across that interval. A finer export is needed to resolve what happens between those observations.
Compare the recorded channels
The two named channels have separate paths in the model. dpLoc.y begins at 50,000 and ends at 51,183. dpLocSet[1].y begins at 15,000 and ends at 60,000. The reference export supplies numerical samples but does not attach a physical unit to these fields. Use the linked model declarations to establish the quantity and units of each channel before calculating a difference or assigning it a physical meaning.
Reproduce the calculation
The largest absolute change between consecutive stored points appears from 7,140 to 7,224 seconds. Subtracting 34,139 from 56,471 gives 22,332 source units. Its location brackets the change within one saved interval of 84 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | dpLoc.y (source units) | dpLocSet[1].y (source units) |
|---|---|---|
0 | 50000 | 15000 |
1680 | 70773.7 | 78000 |
3360 | 153664.9 | 141000 |
3612 | 158586.5 | 150000 |
5040 | 135029.6 | 150000 |
6720 | 64572.41 | 51000 |
7140 | 34138.75 | 19500 |
7224 | 56470.56 | 15900 |
8400 | 51183.22 | 60000 |
What to check on site
Mark the measurement points on a hydraulic schematic and identify whether the controller holds flow or differential pressure. Record pump command and delivered duty together. A site comparison needs the same branch state, including bypasses and closed valves.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Checking the two recorded channels
At 7,224 s, dpLoc.y reads 56,470.6 and dpLocSet[1].y reads 15,900. Across the run, the second channel ranges from 15,000 to 150,000. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.