The recorded Sloads channel spans -1,161 to -667 source units in this reference run. It starts at -667 and ends at -1,037. The first recorded maximum occurs at 0 seconds and the first minimum at 3,480 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named DCLines. The source file places it under Electrical, DC, Lines. We used the 101 stored values for Sloads over the interval 0 to 4,000 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name line (Line), E (Constant Voltage), line1 (Line), line2 (Line). The source declares L = 10. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel E.S[1] covers -1,202 to -683.431 source units. At 880 s, the primary value is -1,051 and the companion is -1,095. Their signed difference is 43.779 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 1,760 to 1,800 seconds. Subtracting -1,019 from -981.133 gives 37.867 source units. Its location brackets the change within one saved interval of 40 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | Sloads (source units) | E.S[1] (source units) |
|---|---|---|
0 | -667 | -683.4305 |
800 | -1030.636 | -1072.811 |
1600 | -1051 | -1094.779 |
1760 | -1019 | -1059.465 |
1800 | -981.1334 | -1018.563 |
2400 | -1075 | -1107.579 |
3200 | -1115 | -1150.971 |
3480 | -1161.4 | -1202.161 |
4000 | -1036.939 | -1075.776 |
What to check on site
Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.