The recorded Sloads channel spans -1,160 to -666.6 source units in this reference run. It starts at -666.6 and ends at -1,036. The first recorded maximum occurs at 0 seconds and the first minimum at 3,480 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named DCLinesLinearized. The source file places it under Electrical, DC, Lines. We used the 101 stored values for Sloads over the interval 0 to 4,000 seconds. This is a simulated test with specified inputs and boundaries.

The reference file contains 2 recorded variables. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.

Compare the recorded channels

The companion channel E.S[1] covers -1,201 to -683.009 source units. At 880 s, the primary value is -1,049 and the companion is -1,093. Their signed difference is 43.618 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

DC lines linearized. The simulated Sloads channel runs from -1,160 to -666.6 source units over 4,000 seconds.
DC lines linearized. The simulated Sloads channel runs from -1,160 to -666.6 source units over 4,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 1,760 to 1,800 seconds. Subtracting -1,017 from -979.768 gives 37.703 source units. Its location brackets the change within one saved interval of 40 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

Sloads (source units)

E.S[1] (source units)

0

-666.6001

-683.0089

800

-1028.993

-1071.016

1600

-1049.268

-1092.886

1760

-1017.471

-1057.801

1800

-979.7684

-1017.082

2400

-1074.029

-1106.542

3200

-1113.859

-1149.746

3480

-1159.99

-1200.636

4000

-1035.507

-1074.217

What to check on site

Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.