The pv.P series gives a net 4,733.2 kWh over 604,800 s when the saved power samples are joined by straight lines. The highest recorded power is 139,019.7 W. The sign follows the model’s measurement boundary. It matters when a connector can exchange energy in either direction.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named Renewables. The source file places it under Chiller Plant, Data Center. We used the 101 stored values for pv.P over the interval 0 to 604,800 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name winTur (Wind Turbine), pv (photovoltaic Simple Oriented), bat (Battery), conv (ACDC Converter). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

At 187,488 s, pv.P is 0 W and winTur.P is 200,000 W. Subtracting the second value from the first gives -200,000 W. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Data centre connected to renewable energy generation. The simulated pv.P channel runs from 0 to 139,020 W over 604,800 seconds.
Data centre connected to renewable energy generation. The simulated pv.P channel runs from 0 to 139,020 W over 604,800 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed pv.P samples by the trapezoidal rule gives 4,733 kWh over 604,800 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

pv.P (W)

winTur.P (W)

0

0

0

114912

25600.8

146604.8

120960

112467.7

151095.2

127008

139019.7

50311.75

241920

0

0

362880

0

0

483840

84704.64

3385.931

604800

0

0

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.