The cooValSta.TOut trace covers 9.394 to 22.011 °C, a temperature span of 12.617 K. The first recorded maximum occurs at 138,912 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named ControlsVerification_CoolingCoilValve. The source file places it under Utilities, Plotters. We used the 101 stored values for cooValSta.TOut over the interval 0 to 315,710 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name TOut_F (Combi Time Table), TSupSetpoint_F (Combi Time Table), coolingValveSignal (Combi Time Table), fanFeedback (Combi Time Table). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel cooValSta.TSup covers 282.428 to 290.65 K. At 138,912 s, the primary value is 295.161 and the companion is 284.206. Their signed difference is 10.956 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 154,698 to 157,855 seconds. Subtracting 290.206 from 287.228 gives -2.978 K. Its location brackets the change within one saved interval of 3,157 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | cooValSta.TOut (K) | cooValSta.TSup (K) |
|---|---|---|
0 | 283.3667 | 285.9278 |
22099.7 | 282.5444 | 286.0389 |
63142 | 291.2556 | 289.2056 |
126284 | 291.4122 | 285.8722 |
138912.4 | 295.1611 | 284.2056 |
154697.9 | 290.2056 | 284.3722 |
157855 | 287.2278 | 283.2611 |
189426 | 284.7111 | 284.2056 |
252568 | 285.1278 | 284.3167 |
315710 | 292.9556 | 286.3167 |
What to check on site
Distinguish the component characteristic from the installed system response. Record the pressure or temperature on both sides as applicable, the direction of flow and the actuator command. Compare a change at constant demand with one caused by a different load.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.