The mov1.P series gives a net 0.01159 kWh over 200 s when the saved power samples are joined by straight lines. The highest recorded power is 395.142 W. The sign follows the model’s measurement boundary. It matters when a connector can exchange energy in either direction.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named ComparePowerTotal. The source file places it under Fluid, Movers. We used the 101 stored values for mov1.P over the interval 0 to 200 seconds. This is a simulated test with specified inputs and boundaries.
The reference file contains 14 recorded variables. Alongside the primary output there are mov1.eta, mov1.etaHyd, mov1.etaMot, mov2.eta, mov2.etaHyd. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.
Compare the recorded channels
At 180 s, mov1.P is 194.719 W and mov2.P is 154.843 W. Subtracting the second value from the first gives 39.876 W. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Reproduce the calculation
Integrating the signed mov1.P samples by the trapezoidal rule gives 0.01159 kWh over 200 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | mov1.P (W) | mov2.P (W) |
|---|---|---|
0 | 0 | 0 |
40 | 14.63471 | 14.64909 |
78 | 356.9302 | 357.2968 |
80 | 395.142 | 395.5481 |
120 | 395.142 | 395.5481 |
160 | 211.7768 | 185.3934 |
200 | 194.7195 | 154.8433 |
What to check on site
Mark the measurement points on a hydraulic schematic and identify whether the controller holds flow or differential pressure. Record pump command and delivered duty together. A site comparison needs the same branch state, including bypasses and closed valves.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.


