The recorded chi.COP channel spans 0 to 11.724 ratio in this reference run. It starts at 5.392 and ends at 0. The first recorded maximum occurs at 7,344 seconds and the first minimum at 1,008 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named ElectricReformulatedEIR. The source file places it under Fluid, Chillers. We used the 101 stored values for chi.COP over the interval 0 to 14,400 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name per (Reform EIR Chiller Mc Quay WSC 471k W 5 89 COP Vanes), chi (Electric Reformulated EIR). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel chi.PLR2 starts at 0.4486, ends at 0 and has a recorded range of 0 to 1.08 source units. Its time span matches the primary channel. Both are included to put the primary response in context. Their numerical scales may represent different physical quantities.

Chiller electric reformulated eir. The simulated chi.COP channel runs from 0 to 11.724 ratio over 14,400 seconds.
Chiller electric reformulated eir. The simulated chi.COP channel runs from 0 to 11.724 ratio over 14,400 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 7,200 to 7,344 seconds. Subtracting 0 from 11.724 gives 11.724 ratio. Its location brackets the change within one saved interval of 144 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

chi.COP (ratio)

chi.PLR2 (source units)

0

5.391724

0.4485795

1008

0

0

2880

0

0

5760

6.601083

0.5899189

7200

0

0

7344

11.72386

1.08

8640

0

0

11520

6.252695

0.6857241

14400

0

0

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.