The transition1.condition output changes state across 4 adjacent pairs in the saved test. Its first transition is bounded by 300 and 315 seconds. It is high at 44 of 101 checkpoints. A checkpoint count and a precise duration are different quantities when transitions occur between stored times.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named StandBy. The source file places it under Fluid, CH Ps. We used the 101 stored values for transition1.condition over the interval 0 to 1,500 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name mWat_flow (Constant), actMod (Mode), transition1 (Transition With Signal), transition2 (Transition With Signal). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel transition2.condition covers 0 to 1 source units. At 315 s, the primary value is 1 and the companion is 0. Their signed difference is 1 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 300 to 315 seconds. Subtracting 0 from 1 gives 1 source units. Its location brackets the change within one saved interval of 15 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | transition1.condition (source units) | transition2.condition (source units) |
|---|---|---|
0 | 0 | 0 |
300 | 0 | 0 |
315 | 1 | 0 |
600 | 1 | 0 |
900 | 0 | 0 |
1200 | 1 | 0 |
1500 | 0 | 0 |
What to check on site
Compare fuel or electrical input with useful heat at a declared delivery boundary. Include the warm-up interval and any period on standby. Separate a temperature setpoint from the measured outlet and keep auxiliary energy in a stated part of the balance.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.
