The recorded eneConEngTem.PEleNet channel spans 0 to 2,500 source units in this reference run. It starts at 0 and ends at 0. The first recorded maximum occurs at 630 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named EnergyConversion. The source file places it under Fluid, CH Ps. We used the 101 stored values for eneConEngTem.PEleNet over the interval 0 to 3,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name eneConEngTem (Energy Conversion), eneConTimDel (Energy Conversion), con (Controller), runSig (Boolean Table). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel eneConTimDel.PEleNet covers 0 to 2,500 source units. At 600 s, the primary value is 2,329 and the companion is 0. Their signed difference is 2,329 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Ch ps energy conversion. The simulated eneConEngTem.PEleNet channel runs from 0 to 2,500 source units over 3,000 seconds.
Ch ps energy conversion. The simulated eneConEngTem.PEleNet channel runs from 0 to 2,500 source units over 3,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 2,670 to 2,700 seconds. Subtracting 2,500 from 0 gives -2,500 source units. Its location brackets the change within one saved interval of 30 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

eneConEngTem.PEleNet (source units)

eneConTimDel.PEleNet (source units)

0

0

0

600

2329.412

0

630

2500

2500

1200

2500

2500

1800

2500

2500

2400

2500

2500

2670

2500

2500

2700

0

0

3000

0

0

What to check on site

Compare fuel or electrical input with useful heat at a declared delivery boundary. Include the warm-up interval and any period on standby. Separate a temperature setpoint from the measured outlet and keep auxiliary energy in a stated part of the balance.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.