The recorded heaPum.P channel spans 49,490 to 113,657 W in this reference run. It starts at 49,490 and ends at 113,657. The first recorded maximum occurs at 1,872 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named Carnot_TCon_LimitedCapacity. The source file places it under Fluid, Heat Pumps. We used the 101 stored values for heaPum.P over the interval 0 to 3,600 seconds. This is a simulated test with specified inputs and boundaries.

The reference file contains 12 recorded variables. Alongside the primary output there are heaPum.TSet, heaPum.sta_b1.T, heaPum.sta_a2.T, heaPum.sta_b2.T, heaPum.sta_a1.T. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.

Compare the recorded channels

The companion channel heaPum.QEva_flow starts at -99,939, ends at -136,343 and has a recorded range of -136,343 to -99,939 W. Its time span matches the primary channel. Both are included to put the primary response in context. Their numerical scales may represent different physical quantities.

Carnot condenser temperature with limited heating capacity. The simulated heaPum.P channel runs from 49,490 to 113,657 W over 3,600 seconds.
Carnot condenser temperature with limited heating capacity. The simulated heaPum.P channel runs from 49,490 to 113,657 W over 3,600 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed heaPum.P samples by the trapezoidal rule gives 81.173 kWh over 3,600 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

heaPum.P (W)

heaPum.QEva_flow (W)

0

49489.76

-99938.81

720

49489.76

-99938.81

1440

49489.76

-99938.81

1800

49489.76

-99938.81

1836

105673.4

-133412.3

1872

113656.7

-136343.3

2160

113656.7

-136343.3

2880

113656.7

-136343.3

3600

113656.7

-136343.3

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.