The recorded senMasFlo.m_flow channel spans 0.000762 to 0.4625 kg/s in this reference run. It starts at 0.000762 and ends at 0.001765. The first recorded maximum occurs at 3,328,128 seconds and the first minimum at 2,592,000 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named BuildingTimeSeriesWithETS. The source file places it under DHC, Loads, Cooling. We used the 101 stored values for senMasFlo.m_flow over the interval 2,592,000 to 3,628,800 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name buiWitETS (Building Time Series With ETS), supChiWat (Boundary p T), sinChiWat (Boundary p T), senMasFlo (Mass Flow Rate). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel buiWitETS.ets.Q_flow starts at 0, ends at -63.021 and has a recorded range of -20,289 to 0 W. Its time span matches the primary channel. Both are included to put the primary response in context. Their numerical scales may represent different physical quantities.

Reproduce the calculation
Integrating the signed rate over 1,036,800 seconds gives a net 45,199 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | senMasFlo.m_flow (kg/s) | buiWitETS.ets.Q_flow (W) |
|---|---|---|
2592000 | 0.0007618417 | 0 |
2799360 | 0.001761191 | -55.81591 |
3006720 | 0.01548113 | -667.3654 |
3214080 | 0.001762518 | -58.26285 |
3317760 | 0.07935417 | -3171.854 |
3328128 | 0.46248 | -20289.28 |
3421440 | 0.001760159 | -53.96751 |
3628800 | 0.001764563 | -63.02082 |
What to check on site
Keep the occupied schedule, weather boundary and zone definition with the result. A change in a simulated room condition can reflect the boundary assumptions as well as the component under study. Compare occupied periods and maintain the same observation location.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.