The recorded bui.bui.QHea_flow channel spans 0 to 224,907 W in this reference run. It starts at 0 and ends at 40,162. The first recorded maximum occurs at 639,360 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named BuildingTimeSeriesWithETS. The source file places it under DHC, Loads, Combined. We used the 101 stored values for bui.bui.QHea_flow over the interval 0 to 864,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name supAmbWat (Boundary p T), sinAmbWat (Boundary p T), senMasFlo (Mass Flow Rate), TDisSup (Constant). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel bui.bui.QReqHea_flow covers 0 to 225,013 W. At 751,680 s, the primary value is 101,199 and the companion is 99,633. Their signed difference is 1,566 W, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Building time series with ets. The simulated bui.bui.QHea_flow channel runs from 0 to 224,907 W over 864,000 seconds.
Building time series with ets. The simulated bui.bui.QHea_flow channel runs from 0 to 224,907 W over 864,000 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed bui.bui.QHea_flow samples by the trapezoidal rule gives 14,552 kWh over 864,000 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

bui.bui.QHea_flow (W)

bui.bui.QReqHea_flow (W)

0

0

0

172800

2267.833

2300

345600

3329.176

3400

518400

53770.38

53800

639360

224906.9

225012.9

691200

54582.95

54700

812160

206763.5

206558.7

820800

97912.35

97600

864000

40162.38

40300

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.