The TBorFieIn.T trace covers 22.09 to 39.698 °C, a temperature span of 17.608 K. The first recorded maximum occurs at 184,496 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named Sandbox. The source file places it under Fluid, Geothermal, Borefields. We used the 101 stored values for TBorFieIn.T over the interval 0 to 186,360 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name borHol (One U Tube), pum (Flow Controlled m flow), TBorFieIn (Temperature Two Port), TBorFieOut (Temperature Two Port). The source declares T_start = 273.15 + 22.09. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel TBorFieOut.T covers 295.24 to 311.57 K. At 169,588 s, the primary value is 312.716 and the companion is 311.417. Their signed difference is 1.298 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Borefield one u tube based on the experiment of beier et al (2011). The simulated TBorFieIn.T channel runs from 295.24 to 312.848 K over 186,360 seconds.
Borefield one u tube based on the experiment of beier et al (2011). The simulated TBorFieIn.T channel runs from 295.24 to 312.848 K over 186,360 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 0 to 1,864 seconds. Subtracting 295.24 from 302.007 gives 6.767 K. Its location brackets the change within one saved interval of 1,864 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

TBorFieIn.T (K)

TBorFieOut.T (K)

0

295.24

295.24

1863.6

302.007

300.7657

37272

310.089

308.7937

74544

311.3776

310.1064

111816

311.9698

310.6964

149088

312.4728

311.1938

184496.4

312.8478

311.5586

186360

312.8433

311.5703

What to check on site

The thermal history of a borefield matters across repeated loads. Distinguish a fluid outlet reading from pipe wall, grout and far-field temperatures. Record the duration and sign of each heat pulse before comparing an installation with a reference case.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.