The boi1.sta_a.T trace covers 20 to 30 °C, a temperature span of 10 K. The first recorded maximum occurs at 0 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named BoilerTable. The source file places it under Fluid, Boilers. We used the 101 stored values for boi1.sta_a.T over the interval 0 to 6,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name boi1 (Boiler Table), boi2 (Boiler Table), sin (Boundary p T), sou (Boundary p T). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel boi1.sta_b.T covers 293.15 to 315.032 K. At 4,200 s, the primary value is 293.15 and the companion is 305.607. Their signed difference is -12.457 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Boilers with efficiency described by table. The simulated boi1.sta_a.T channel runs from 293.15 to 303.15 K over 6,000 seconds.
Boilers with efficiency described by table. The simulated boi1.sta_a.T channel runs from 293.15 to 303.15 K over 6,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 4,800 to 4,860 seconds. Subtracting 293.15 from 294.15 gives 1 K. Its location brackets the change within one saved interval of 60 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

boi1.sta_a.T (K)

boi1.sta_b.T (K)

0

303.15

293.15

1200

303.15

310.8647

2400

303.15

303.1501

3600

298.15

310.5387

4200

293.15

305.6067

4800

293.15

305.2081

4860

294.15

305.6312

6000

303.15

315.0322

What to check on site

Compare fuel or electrical input with useful heat at a declared delivery boundary. Include the warm-up interval and any period on standby. Separate a temperature setpoint from the measured outlet and keep auxiliary energy in a stated part of the balance.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.