The recorded add.y channel spans -0.04452 to 0.0445 source units in this reference run. It starts at 0 and ends at 0.04194. The first recorded maximum occurs at 12,614,400 seconds and the first minimum at 321,667,200 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named Analytic_20Years. The source file places it under Fluid, Geothermal, Borefields, Heat Transfer. We used the 101 stored values for add.y over the interval 0 to 630,720,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name groTemRes (Ground Temperature Response), timTabQ (Combi Time Table), add (Add), timTabT (Combi Time Table). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel TBorWal.y covers 260.559 to 285.986 source units. At 630,720,000 s, the primary value is 0.04194 and the companion is 285.986. Their signed difference is -285.944 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Analytic 20 years. The simulated add.y channel runs from -0.04452 to 0.0445 source units over 630,720,000 seconds.
Analytic 20 years. The simulated add.y channel runs from -0.04452 to 0.0445 source units over 630,720,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 277,516,800 to 283,824,000 seconds. Subtracting -0.04431 from -0.005074 gives 0.03923 source units. Its location brackets the change within one saved interval of 6,307,200 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

add.y (source units)

TBorWal.y (source units)

0

0

273.15

1.26144e+07

0.04450073

285.0193

1.26144e+08

-0.02439493

267.4537

2.52288e+08

0.004377979

275.7736

2.775168e+08

-0.04430756

260.5595

2.83824e+08

-0.005073563

271.4945

3.216672e+08

-0.04451847

260.6616

3.78432e+08

-0.01872799

267.218

5.04576e+08

-0.00409386

272.757

6.3072e+08

0.0419402

285.9857

What to check on site

The thermal history of a borefield matters across repeated loads. Distinguish a fluid outlet reading from pipe wall, grout and far-field temperatures. Record the duration and sign of each heat pulse before comparing an installation with a reference case.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.