The manufacturing business count for South Burnett, QLD stood at 100 in June 2025. Two years earlier it was 109, followed by 106 in June 2024. The ABS groups these businesses under manufacturing division C and reports the geography as South Burnett (area code 36630).
What changed between 2023 and 2025
From June 2024 to June 2025, the local total fell by 6 (5.7%). Across the two years from June 2023 it fell by 9 (8.3%). These are annual snapshots. They can highlight a change worth investigating, but production volume, employment and demand require their own measures.
Among areas included in this atlas in Queensland, Cassowary Coast had the closest June 2025 total at 99, a difference of one business. This gives a comparison at a similar business scale. Industry mix, distance and purchasing patterns may differ between the two places.
How the businesses are distributed

The non-employing band contained 58 businesses. A further 20 were recorded in the 1–4 employee band.
The ABS reported 12 in the 5–19 employee band, 10 with 20–199 and 0 with 200 or more.
The largest turnover band was $200,000 to under $2 million, with 33 businesses. The turnover table’s published total was 100.
Businesses at either end of the turnover range
In South Burnett, 28 businesses fell below $50,000 in annual turnover and 5 fell in the $10 million-or-more band. Across the three published bands starting at $2 million, the counts add to 13. Each business counts once within a turnover band, regardless of the number of people it employs.
Reading the figures
Employment and turnover are separate breakdowns of the same industry or area. The tables do not cross-classify the two. ABS confidentiality adjustments can make the component counts differ from the published total. A business with several sites is assigned to its main location.
Data downloads and further reading
Download this profile’s numbers (CSV)
ABS employment-size and business-count workbook
ABS annual turnover-size workbook
ABS business counts methodology
Compare the manufacturing profile for Cassowary Coast
Field guide — How rework turns 92% first-pass yield into 98% final yield
