Manufacturing
When rework hides a drop in first-pass yield
Count units at their first inspection to distinguish a healthy process from one kept on target by a busy rework station.

A fabrication shop ships almost everything it makes. Its rework bench nonetheless has a growing queue. Final acceptance and first-pass yield each describe the line honestly, provided the report identifies when a unit was assessed. Tracking both exposes the cost of recovering initially failed units.
Follow the batch by unit identity
Choose one operation, a cohort of units entering it and a consistent first inspection point. A unit that returns for another pass keeps its original identity. Record first-pass acceptance, eventual recovery and scrap separately. Including yesterday’s recovered stock in today’s incoming cohort can distort both measures.
Consider 500 components entering inspection. On first pass, 460 are accepted. Of the 40 remaining, 30 pass after rework and 10 are scrapped. First-pass yield is 460 ÷ 500 = 92%. Final yield for that cohort is 490 ÷ 500 = 98%. The six-point gap represents 30 recovered units.

What to check on site
Tie each defect to the original batch or unit identifier.
Time the rework and retest steps alongside material waste.
Compare the same product family and inspection criteria across shifts.
For an Australian machine shop or a New Zealand contract manufacturer, the rework-hours log can explain why a good dispatch result still coincides with late orders. Follow the defect category consuming the most repeat hours.
Sources and photograph
A fabrication shop ships almost everything it makes. Its rework bench nonetheless has a growing queue. Final acceptance and first-pass yield each describe the line honestly, provided the report identifies when a unit was assessed. Tracking both exposes the cost of recovering initially failed units.
Follow the batch by unit identity
Choose one operation, a cohort of units entering it and a consistent first inspection point. A unit that returns for another pass keeps its original identity. Record first-pass acceptance, eventual recovery and scrap separately. Including yesterday’s recovered stock in today’s incoming cohort can distort both measures.
Consider 500 components entering inspection. On first pass, 460 are accepted. Of the 40 remaining, 30 pass after rework and 10 are scrapped. First-pass yield is 460 ÷ 500 = 92%. Final yield for that cohort is 490 ÷ 500 = 98%. The six-point gap represents 30 recovered units.

What to check on site
Tie each defect to the original batch or unit identifier.
Time the rework and retest steps alongside material waste.
Compare the same product family and inspection criteria across shifts.
For an Australian machine shop or a New Zealand contract manufacturer, the rework-hours log can explain why a good dispatch result still coincides with late orders. Follow the defect category consuming the most repeat hours.