The shift used less electricity. Why did energy per tonne rise?
Two meter readings and a production count can tell different stories. A worked factory example shows how to set a fair boundary around electricity use.

One packing shift uses 336 kWh, the next uses 300 kWh. Judging by the electricity total, the second shift looks more efficient. Production tells a different story. This worked example shows what an Australian food plant or a New Zealand processor can learn from figures it may already collect.
Give the meter and the production count the same boundary
Choose one line, building or site. Write down what the electricity meter includes, the meter’s unit, the shift start and finish, and the source of accepted output. If a shared compressor is on the same meter, include that fact in the comparison. Match production records and electricity timestamps to the same shift. Use tonnes of saleable product and record rejects separately.
Calculate the two shifts
Shift A starts at 10,200 kWh and finishes at 10,536 kWh. It used 336 kWh to produce 12 saleable tonnes. Its intensity was 336 ÷ 12 = 28 kWh/t.
Shift B finishes at 10,836 kWh, an increase of 300 kWh since shift A. It produced 10 saleable tonnes. Its intensity was 300 ÷ 10 = 30 kWh/t.
Total electricity fell by 36 kWh, about 10.7%. Electricity per saleable tonne rose by about 7.1%. The figures describe these two shifts only.

Find the next measurement
Lay the interval-meter trace alongside the production log. Mark warm-up, product changeovers, cleaning and idle time. Look for electricity use during the gap between the last good pack and shutdown. If a different pack size or a longer cleaning cycle explains the change, compare several runs of the same product and line setting before assigning a cause.
Australia’s metering guide is a starting point for deciding where submetering would answer a specific question. New Zealand’s EECA guide starts with how and when the site consumes energy. UNIDO explains how an energy performance indicator relates consumption to relevant variables. Keep fuel and steam in separate columns when the meter measures electricity alone. Add tariff information only when you are ready to answer a cost question.
Methods for the site energy team
Australian Government — metering and monitoring
One packing shift uses 336 kWh, the next uses 300 kWh. Judging by the electricity total, the second shift looks more efficient. Production tells a different story. This worked example shows what an Australian food plant or a New Zealand processor can learn from figures it may already collect.
Give the meter and the production count the same boundary
Choose one line, building or site. Write down what the electricity meter includes, the meter’s unit, the shift start and finish, and the source of accepted output. If a shared compressor is on the same meter, include that fact in the comparison. Match production records and electricity timestamps to the same shift. Use tonnes of saleable product and record rejects separately.
Calculate the two shifts
Shift A starts at 10,200 kWh and finishes at 10,536 kWh. It used 336 kWh to produce 12 saleable tonnes. Its intensity was 336 ÷ 12 = 28 kWh/t.
Shift B finishes at 10,836 kWh, an increase of 300 kWh since shift A. It produced 10 saleable tonnes. Its intensity was 300 ÷ 10 = 30 kWh/t.
Total electricity fell by 36 kWh, about 10.7%. Electricity per saleable tonne rose by about 7.1%. The figures describe these two shifts only.

Find the next measurement
Lay the interval-meter trace alongside the production log. Mark warm-up, product changeovers, cleaning and idle time. Look for electricity use during the gap between the last good pack and shutdown. If a different pack size or a longer cleaning cycle explains the change, compare several runs of the same product and line setting before assigning a cause.
Australia’s metering guide is a starting point for deciding where submetering would answer a specific question. New Zealand’s EECA guide starts with how and when the site consumes energy. UNIDO explains how an energy performance indicator relates consumption to relevant variables. Keep fuel and steam in separate columns when the meter measures electricity alone. Add tariff information only when you are ready to answer a cost question.
Methods for the site energy team
Australian Government — metering and monitoring