Technology Outlook
Why averaging two PUE readings gives the wrong data-centre result
A high-load month carries more weight in an energy ratio. Recalculate the period from facility and IT kilowatt-hours before drawing a trend.
For a period spanning several months, add facility energy and IT energy separately, then divide the totals. An unweighted average of monthly power usage effectiveness (PUE) values gives an idle month as much influence as a busy one. The error grows when IT load varies sharply.
Follow two very different months
Consider a small data centre with 150 MWh of total facility consumption and 100 MWh of IT consumption in month A. PUE is 1.50. In month B the totals are 60 and 30 MWh, giving 2.00. The simple mean is 1.75. The period consumes 210 MWh to support 130 MWh of IT load, so its PUE is about 1.62. The difference comes from weighting each month by IT energy.

Worked data
Reporting period | Facility / IT energy (MWh) | PUE |
Month A | 150 / 100 | 1.50 |
Month B | 60 / 30 | 2.00 |
Combined | 210 / 130 | 1.62 |
Download the figures in this worked example (CSV)
Mark the edge of the computer room
In a mixed industrial building, a parent meter may also supply offices or a production floor. Establish how shared cooling, UPS losses and other support loads are measured or allocated. A boundary change between months makes even a correctly weighted result misleading. Record the meter locations, interval dates and the treatment of missing values.
PUE describes overhead relative to IT energy. It says little about how much useful computing was delivered. One site can improve its ratio by increasing IT load while total consumption rises. When discussing a cooling improvement, show overhead energy and IT energy alongside the ratio. Refer to the Data Center Metrics Task Force recommendations for measurement boundaries and reporting conventions.
Separate energy saved from a better-looking ratio
Month A uses 50 MWh beyond the measured IT boundary. Month B uses 30 MWh. On a ratio chart B looks worse, even though it uses 20 MWh less overhead energy. With the smaller IT load, a relatively fixed group of support loads takes up a larger share. The sum of the two overhead quantities, 80 MWh, is often the more informative starting point for an energy project.
To assess a cooling change, compare periods with similar IT load and weather or explicitly model how those conditions changed. State whether any office, UPS or mechanical plant measurement was allocated. If an interim allocation changes midway through the year, retain the original series and show a bridge to the revised boundary. Mixing one old month and one new month can make an administrative change look like physical improvement.
The same caution applies when comparing two facilities. One may operate partly empty, provide a different level of redundancy, or place its IT energy measurement at a different point. Publishing the numerator, denominator and measurement boundary beside the ratio gives another operator enough information to decide whether the comparison is meaningful.
Sources
Data Center Metrics Task Force · Measuring and reporting PUE
Cover illustration by Industry Applied, generated with AI. Rows of server cabinets and cooling equipment.
For a period spanning several months, add facility energy and IT energy separately, then divide the totals. An unweighted average of monthly power usage effectiveness (PUE) values gives an idle month as much influence as a busy one. The error grows when IT load varies sharply.
Follow two very different months
Consider a small data centre with 150 MWh of total facility consumption and 100 MWh of IT consumption in month A. PUE is 1.50. In month B the totals are 60 and 30 MWh, giving 2.00. The simple mean is 1.75. The period consumes 210 MWh to support 130 MWh of IT load, so its PUE is about 1.62. The difference comes from weighting each month by IT energy.

Worked data
Reporting period | Facility / IT energy (MWh) | PUE |
Month A | 150 / 100 | 1.50 |
Month B | 60 / 30 | 2.00 |
Combined | 210 / 130 | 1.62 |
Download the figures in this worked example (CSV)
Mark the edge of the computer room
In a mixed industrial building, a parent meter may also supply offices or a production floor. Establish how shared cooling, UPS losses and other support loads are measured or allocated. A boundary change between months makes even a correctly weighted result misleading. Record the meter locations, interval dates and the treatment of missing values.
PUE describes overhead relative to IT energy. It says little about how much useful computing was delivered. One site can improve its ratio by increasing IT load while total consumption rises. When discussing a cooling improvement, show overhead energy and IT energy alongside the ratio. Refer to the Data Center Metrics Task Force recommendations for measurement boundaries and reporting conventions.
Separate energy saved from a better-looking ratio
Month A uses 50 MWh beyond the measured IT boundary. Month B uses 30 MWh. On a ratio chart B looks worse, even though it uses 20 MWh less overhead energy. With the smaller IT load, a relatively fixed group of support loads takes up a larger share. The sum of the two overhead quantities, 80 MWh, is often the more informative starting point for an energy project.
To assess a cooling change, compare periods with similar IT load and weather or explicitly model how those conditions changed. State whether any office, UPS or mechanical plant measurement was allocated. If an interim allocation changes midway through the year, retain the original series and show a bridge to the revised boundary. Mixing one old month and one new month can make an administrative change look like physical improvement.
The same caution applies when comparing two facilities. One may operate partly empty, provide a different level of redundancy, or place its IT energy measurement at a different point. Publishing the numerator, denominator and measurement boundary beside the ratio gives another operator enough information to decide whether the comparison is meaningful.
Sources
Data Center Metrics Task Force · Measuring and reporting PUE
Cover illustration by Industry Applied, generated with AI. Rows of server cabinets and cooling equipment.

