How much electrical power reaches the water?
Use measured flow, total head and electrical input to check a pump duty point. A worked example shows where a station can lose comparability.

Two identical-looking pumps at irrigation stations can deliver different amounts of water for the same electricity. The comparison starts with what each station asks the pump to do. A hillside delivery and a level transfer have different duties even when their outlet flow meters agree.
Compare one steady duty point
Record flow, total differential head and electrical input over the same steady interval. Total head includes the appropriate elevation, pressure and velocity terms at the measurement planes. Electrical input measured at the drive supply includes drive and motor losses. Mark those boundaries on the test sheet so the next operator can reproduce them.
For fresh water, take density as 1,000 kg/m³ and gravitational acceleration as 9.81 m/s². At 0.020 m³/s and 18 m total head, hydraulic power is 1,000 × 9.81 × 0.020 × 18 = 3.53 kW. With 5.0 kW measured electrical input, wire-to-water efficiency is about 71%.

What to check on site
Record tank levels and valve positions while the readings are taken.
Use a measured electrical input from the site meter or drive system and record its location.
Compare repeat tests at similar flow and head before attributing a change to pump wear.
An Australian council or a New Zealand irrigation scheme can put the duty point beside its pump curve. A changed operating point can move efficiency even when the equipment is healthy.
Sources and photograph
US Department of Energy — improving pumping system performance
Two identical-looking pumps at irrigation stations can deliver different amounts of water for the same electricity. The comparison starts with what each station asks the pump to do. A hillside delivery and a level transfer have different duties even when their outlet flow meters agree.
Compare one steady duty point
Record flow, total differential head and electrical input over the same steady interval. Total head includes the appropriate elevation, pressure and velocity terms at the measurement planes. Electrical input measured at the drive supply includes drive and motor losses. Mark those boundaries on the test sheet so the next operator can reproduce them.
For fresh water, take density as 1,000 kg/m³ and gravitational acceleration as 9.81 m/s². At 0.020 m³/s and 18 m total head, hydraulic power is 1,000 × 9.81 × 0.020 × 18 = 3.53 kW. With 5.0 kW measured electrical input, wire-to-water efficiency is about 71%.

What to check on site
Record tank levels and valve positions while the readings are taken.
Use a measured electrical input from the site meter or drive system and record its location.
Compare repeat tests at similar flow and head before attributing a change to pump wear.