Why a factory water balance needs both tank readings

A filling tank can look like unaccounted water. Reconcile incoming flow, metered uses and opening and closing storage on one boundary.

Industry Applied Editorial Published 1 min read

Aerial shot of an industrial water treatment plant with large circular tanks.

A site water meter reads 100 kL for a shift. The submeters account for 76 kL, and someone calls the remaining 24 kL a leak. A storage tank filled while the line was running. Part of the difference may still be sitting inside the site boundary.

Draw the boundary before adding flows

List the inlets, outlets, metered uses and storage volumes for the same interval. A submeter inside another measured branch should be counted at one level only. Use a level-to-volume table where a tank has an irregular shape. Record any return stream that crosses your chosen boundary.

In a worked example, the incoming meter records 100 kL and separately metered uses sum to 76 kL. The tank rises from 12 to 30 kL, so storage increased by 18 kL. The residual is 100 − 76 − 18 = 6 kL. That residual includes unmetered uses, meter error and timing mismatch as well as possible leakage.

Where the incoming 100 kL went. Metered uses 76 kL. Added storage 18 kL. Residual 6 kL.

What to check on site

  • Check clock alignment before subtracting short meter intervals.

  • List internal transfers so the same volume is not counted twice.

  • Compare the residual with plausible meter uncertainty and the resolution of tank levels.

A food processor can repeat this for production and washdown shifts. A residual that appears mainly during tank transfers points to a different investigation from one that persists on quiet nights.